Mobile version

News

29.06.2016 14:32 Age: 8 yrs

[Saral] A new phase with a drifting orbit

Category: News of the Saral mission, Operational news

SARAL/AltiKa will leave its repetitive orbit by beginning a new phase named "Saral Drifting Phase", “SARAL-DP” from Monday 4 July. The data processing as well as data latency are unchanged.

SARAL/AltiKa mission will enter in a new phase named “SARAL-DP”. Indeed, from July 4th onwards, SARAL satellite will fly free of station keeping maneuvers; the repetitive ground track will be no more maintained and with the natural decay of the orbit, the ground track will drift. “SARAL-DP” stands for SARAL Drifting Phase

This decision - endorsed by CNES and ISRO management - is due to the technical issues we have encountered on the reaction wheels since March 2015 and was proposed considering 2 key drivers:

  • fine station keeping maneuvers with thrusters only is very difficult to achieve,
  • there are new science perspectives emerging with drifting orbits on mean sea surface (MSS), geodesy/ bathymetry and other applications. 

and implements two recommendations made by the Science Team in 2015 OSTST meeting which are recalled hereafter :

  • RECOMMEND the not-maintained (drifting) orbit for MSS/Gravity/Bathymetry.
  • RECOMMEND this phase to start as soon as possible (awaiting 3 years project meeting in early 2016)

Altimetry payload will be operated nominally on the drifting orbit; data processing is unchanged as well as data latency.

Even no more linked to the ground track, we keep a “cycle” duration of 35 days with 1002 passes (sub cycle ~ 16 days); cycle number will jump to #100 and OGDR, IGDR and GDR products will be produced as before.

Concerning the SSALTO/Duacs products, no change is foreseen in the Near-Real-Time processing since the reaction wheels issue has been taken into account on June 30th, 2015 (i.e. no theoretical track projection but use of a gridded Mean Sea Surface (MSS) solution). 

Please note also that a semi-major axis increase (+1 km) will be performed just before to start the new phase. This maneuver will optimize the sampling for mesoscale applications for the next 2 years.

CNES and ISRO share the common objective to continue the SARAL mission as long as possible both for altimetry and ARGOS and we hope that the drifting phase will be as successful as the first 3 years on the repetitive orbit. Of course you will be informed on the progress of operational activities.

T. Guinle, J. Verron, P. Bonnefond, S. Arunan


EnglishFrançais
Rss feedsContactPartnersFAQLexiconLegal noticePersonal Data Protection PolicyMobile
You must enable cookies in your browser preferences to save the modifications
You are using an older version of Internet Explorer, please update to take full advantage of Aviso+ features

Customize the home page

View all widgets
Reduce display
Public profile
User profile

Select/Deselect widgets

Discover AVISO+

Customizable home, reading tools, products search guide, etc.. Discover step by step the features of the new site AVISO+.

Customizable homepage

This home page is composed of blocks called "widgets".

Rearrange the blocks with a "Click & Drop".

Hide a widget with the cross at the top right. Reset or add a widget with the "wrench" icon. The "User" and "Public" profiles offer a predefined organization.

All the modifications are automatically saved as cookies on your machine so as to enable you to have your own specific AVISO+.

Reading tools

Ease your reading by choosing the page background colour (black/white) and/or by modifying the font size.

Browsing menu and breadcrum trail

To ease your browsing through AVISO+, you can use at any time the main banner items with the interactive submenus or use the browsing menu on the left side of the screen (it is open by default). For more readiness of the page contents, you can fold and unfold the browsing menu by clicking on the tab. At any time you can know where you are thanks to the browsing menu or the breadcrum at the top of the page.

Products search guide

The first submenu of the "Data" banner item leads you to a new search form enabling you to find quickier the product that suits your needs. The list of results is updated according to your selection criteria.

AVISO+ Multimedia

The first submenu of the "Multimedia" banner item leads you to AVISO+ collections of images and videos linked to altimetry and its applications. Have a nice visit!