Operational News
Operational news about Ssalto and Duacs processing system.
18.01.2017 Live Access Server (LAS) temporarily interrupted on January 18, 2017
Due to a technical problem the Live Access Server is temporarily interrupted. We apologize for the inconvenience.
25.10.2016 Temporary unavailability of the CNES ftp server on October 27, 2016
For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr/AVISO/pub) is unavailable on October 27, 2016 between 10:00 and 12:30 UTC. We apologize for the inconvenience.
02.09.2016 [Jason-3] integration as a new reference mission in Ssalto/Duacs

The new reference mission Jason-3 will be integrated in the Ssalto/Duacs multimission system on September 13, 2016. [more]
23.08.2016 [Saral] reintegrated in the Ssalto/Duacs system
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission was temporary deactivated in the Ssalto/Duacs system since 2016/08/09. Today the Saral/Altika is reintegrated in the processing chain.
16.08.2016 [Saral] temporary deactivated in the Ssalto/Duacs system (ADT and MADT production impacted)
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission is temporary deactivated in the Ssalto/Duacs system.[more]
25.07.2016 Temporary unavailability of the CNES ftp server on July 26, 2016
For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr/AVISO/pub) is unavailable on July 26, 2016 between 6:00 and 8:00 UTC. We apologize for the inconvenience.
25.07.2016 [ENVISAT] New POE Orbit files for GDR-E available
All Precise Orbit Determination files version GDR-E for the entire mission are now reprocessed and available.[more]
13.07.2016 Temporary interruption of the Online Data Extraction Service (ODES)
For maintenance reasons, the Online Data Extraction Service (ODES) will be unavailable for a few days.[more]
29.06.2016 [Saral] A new phase with a drifting orbit

SARAL/AltiKa will leave its repetitive orbit by beginning a new phase named "Saral Drifting Phase", âSARAL-DPâ from Monday 4 July. The data processing as well as data latency are unchanged.[more]
16.06.2016 Live Access Server (LAS) temporarily interrupted on 18th June
For maintenance reasons, the Live Access Server will be temporarily interrupted on Saturday, 18th June, 2016 from 6:00 to 13:00 UTC
Further information about this tool.
We apologize for the inconvenience.[more]