Operational News
Operational news about Ssalto and Duacs processing system.
18.02.2009 [Jason-2 IGDR] update of AMR and Poseidon3 characterisation files
AMR and Poseidon3 characterisation files used in the Jason-2 processing chains have been updated on the 18th of February 2009. Impact is expected on Jason-2 IGDR product quality beginning cycle 23.[more]
18.02.2009 Jason-1 on its new orbit
Jason-1 is on its new orbit since the 14 February 2009 at 20:51 UTC.
Nominal production of all data products is ongoing.
21.01.2009 Jason-2 IGDR products available
Jason-2 IGDR products are available on AVISO server from now.
These products are computed at CNES in NetCDF file format.
3 types of files are available :
- a IGDR native NetCDF formatted datasets ("standard product");
- a reduced 1Hz subset of the full dataset (IGDR-SSHA);
- an expert sensor product containing the full radar-echo waveforms (S-IGDR)
21.01.2009 [DUACS] Switch from Jason-1 to Jason-2
The DUACS system has switched from Jason-1 to Jason-2 this morning (January 21 2009).Jason-2 is used as the reference mission for the orbit error reduction scheme.
When Jason-1 will reach its new orbit, we'll re-integrate it in the multisatellite system (tentative date: February 16)Another news will be published when it will be effective.[more]
14.01.2009 Jason-1 shifted on a new orbit
Jason-1 will be shifted on a new orbit, beginning January 26 (cycle 260) up to February 8 or 9 (beginning of cycle 262). Jason-2 takes over the reference ground track.
11.09.2008 Ssalto/Duacs products updated
After the problem detected on Jason-1 the 2008/08/07, Jason-2 data was integrated in Ssalto/Duacs near-real time processing.
In order to consolidate the quality of Duacs data over the past weeks, the data were reprocessed (between the 2008/08/07 - 2008/08/29 for the gridded products and between the 2008/08/07 - 2008/09/02 for the along track products). The regional product on the Mediterranean Sea (regional-mfstep) is also concerned for the gridded and along track data. Today, all is nominal.
To be regularly advice of Ssalto/Duacs updates, feel free to contact the Aviso user service (aviso@cls.fr) with "Subscribe Ssalto/Duacs updates" as subject.[more]
26.08.2008 DUACS production resumed this morning
A back up processing chain will be set in place.
Click on the link for more informations...[more]
25.08.2008 SSALTO/DUACS products unavailable since 2008/08/21
The recent Jason-1 safehold mode induced a data gap in the Jason-1 altimeter data series and this gap is larger than the one allowed by the resilience of the DUACS system.
The production is scheduled to be resumed this night.
22.08.2008 Jason-1 back to operational mode
- 2008/08/20 : Jason-1 mass memory has been reconfigured and the payload has been switched on.
- 2008/08/22 : IGDR products are computed again from 2008/08/20 10h52 TU
19.08.2008 Jason-1 latest news
The satellite is out of safehold mode since 2008/08/13.
A problem of mass memory has been detected the 2008/08/14. Investigations are ongoing on CNES and THALES sides.