Operational News
Operational news about Ssalto and Duacs processing system.
25.02.2019 [Jason-3] Jason-3 in Safe Hold Mode since Feb 24th 09:57:16TU
On Sunday, February 24th, at 09:57:16TU, the Jason-3 spacecraft entered safe hold mode, immediately interrupting its measurements due to an important mispointing.[more]
19.02.2019 [Saral/AltiKa] SARAL/AltiKa satellite encountered since 3rd of February 2019 some issues affecting the nadir pointing accuracy
SARAL/AltiKa satellite encountered since 3rd of February 2019 some issues affecting the nadir pointing accuracy[more]
18.02.2019 [Jason-2] Jason-2 is in safe mode since Saturday, February 16th 2019 @14:56:48 UTC
The Jason-2 spacecraft entered safe mode Saturday, February 16th 2019 @14:56:48 UTC immediately interrupting its measurements. [more]
14.02.2019 [Jason-2/Jason-3] MOE calculation takes into account DORIS and GPSP measurements
Starting Wednesday February 13th 2019, DORIS and GPSP measurements are taken into account for the calculation of Jason-2 and Jason-3 MOE.[more]
29.01.2019 [Sentinel-3B L2P] redelivery of L2P S3B Near Real Time and Short Time Critical
Due to inapproriate global attributes in the files, the whole files of NRT and STC S3B L2P time series have been reprocessed and redistributed today (29/01 after 14h UTC) on the Aviso+ ftp server.[more]
11.01.2019 [Jason-2] has restarted successfully on Monday 7th, January
All core payload instruments have been restarted around 8:30UTC on Monday 7th January[more]
27.12.2018 [Jason-2] is in safe hold mode since December 26th at 01:33:54UTC
The Jason-2 spacecraft entered safe mode on Wednesday, December 26th 2018 at @01:33:54UTC, immediately interrupting its measurements. [more]
20.12.2018 [Jason-3] reprocessed POE delivery
All POE have been reprocessed for Jason-3 in level F.[more]
26.10.2018 Data delivery on the CNES FTP Server delayed
Please be informed that due to a hard failure impacting the Cnes/Ssalto echanges, the data delivery on the CNES FTP server may be affected. Actions are on going to resume to nominal situation.
We apologize for the inconvenience[more]
25.10.2018 [Jason-2] Jason-2 is back to nominal
Today, October 25th, all core-mission instruments have been restarted[more]