Operational News
Operational news about Ssalto and Duacs processing system.
31.03.2017 [JASON-2] now fully operational after the safe mode
The Jason-2 satellite is now fully operational.[more]
22.03.2017 [Jason-2] after the Safe Mode, nominal activities restart
After the Jason-2 Safe Hold Mode on 2017/03/19, nominal recovery activities restart on 2017/03/22. Products should be available on 2017/03/24.[more]
16.03.2017 [Jason-2] Jason-2 in safe mode since March 15th, 19:19 UTC
The Jason-2 spacecraft entered safe mode on Wednesday, March 15th at 19:19:19 UTC, immediately interrupting its measurements. [more]
06.03.2017 Temporary unavailability of the CNES ftp server on March 8-9, 2017
For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr/AVISO/pub) is unavailable on
March 8, 2017 between 7:00 and 9:00 UTC,March 9, 2017 between 7:00 and 9:00 UTC.
We apologize for the inconvenience. [more]
19.01.2017 Temporary unavailability of the ODES Service on January 31, 2017
For maintenance reason, the ODES Service (http://odes.altimetry.cnes.fr) is unavailable from January 31, 2017 11:00 UTC until 13:00 UTC.
18.01.2017 Live Access Server (LAS) temporarily interrupted on January 18, 2017
Due to a technical problem the Live Access Server is temporarily interrupted. We apologize for the inconvenience.
25.10.2016 Temporary unavailability of the CNES ftp server on October 27, 2016
For maintenance reason, the Cnes ftp server (ftp://avisoftp.cnes.fr/AVISO/pub) is unavailable on October 27, 2016 between 10:00 and 12:30 UTC. We apologize for the inconvenience.
02.09.2016 [Jason-3] integration as a new reference mission in Ssalto/Duacs
The new reference mission Jason-3 will be integrated in the Ssalto/Duacs multimission system on September 13, 2016. [more]
23.08.2016 [Saral] reintegrated in the Ssalto/Duacs system
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission was temporary deactivated in the Ssalto/Duacs system since 2016/08/09. Today the Saral/Altika is reintegrated in the processing chain.
16.08.2016 [Saral] temporary deactivated in the Ssalto/Duacs system (ADT and MADT production impacted)
Due to an issue on the processing of the Saral/AltiKa drifting orbit, the mission is temporary deactivated in the Ssalto/Duacs system.[more]