Actualités
[Saral/Altika] SARAL cycle 135 GDR processed with F-standard
SARAL cycle 135 GDR (from 2019-11-11 to 2019-12-16) has just been released. This is the first GDR cycle processed with F-standard.
The GDR-F includes about 50 improvements, including New Radiometer processing algorithms, Updated altimeter calibration schemes, Updated geophysical corrections, 3-Parameter SSBâ¦
Detailed informations here