SSALTO Status |
||
All nominal. |
||
Missions |
||
JASON-3 |
Nothing to report |
|
CRYOSAT-2 |
Nothing to report |
|
HY2-B |
Nothing to report |
|
HY2-C |
Nothing to report |
|
HY2-D |
Nothing to report |
|
SARAL |
GDR cycle 179 in
progress (arc 3/5 ongoing) |
|
SENTINEL-3A |
Maneuver planned on 21st of March
2024. |
|
SENTINEL-3B |
Maneuver planned
on 20th of March 2024. |
|
SENTINEL-6A |
Nothing to report |
|
CFOSAT |
in Safe Hold Mode
since 2013/03/10 21h50 UTC: SHM recovery complete, data production resumed on
Monday 2024/03/18. |
|
SWOT |
Data processing degraded
since 2024/03/15 due to network problem linking HBX station. Maneuver executed
OK on 15th of March 2024. |
|
DORIS Master and Time Beacons |
||
TLSE |
Nothing to report |
|
KOUROU |
Nothing to report |
|
HBK |
Nothing to report |
|
PAPEETE |
Nothing to report |
|
TERRE
ADELIE |
Nothing to report |
|
Legend |
||
Color |
Meaning |
|
GREEN |
Operational |
|
YELLOW |
Operational with limitations |
|
ORANGE |
Operational with
Degraded Performance |
|
RED |
Not Operational |
|
Questions or comments
to aviso@altimetry.fr |