26.10.2018 Data delivery on the CNES FTP Server delayed
Please be informed that due to a hard failure impacting the Cnes/Ssalto echanges, the data delivery on the CNES FTP server may be affected. Actions are on going to resume to nominal situation.
We apologize for the inconvenience[details]
25.10.2018 [Jason-2] Jason-2 is back to nominal
Today, October 25th, all core-mission instruments have been restarted[details]
22.10.2018 [Jason 2] Jason 2 in Safe Hold Mode on October 19th at 11:41:34UTC
Jason 2 in Safe Hold Mode on October 19th at 11:41:34UTC[details]
06.09.2018 [Sentinel-3A L2P] redelivery of NTC Sentinel-3A cycle 24 on September 6th 2018
Please, be informed that the cycle 24 of the NTC Sentinel-3A L2P products covering the period between 16/11 to 23/11/2017 has been redelivered.Indeed, following the installation of the new software version, the values of the SLA bias were not correct. The files from version 02_00 named global_sla_l2p_ntc_s3a_C0024_P*_201711*_20180823*.nc.gz have been redelivered with the corrected variables 'inter_mission_bias' and 'sea_level_anomaly'
We apologize for the inconvenience.[details]
25.07.2018 [JASON-2] : BACK TO OPERATIONS
From today at 08:30UTC Jason-2 spacecraft is back to operations[details]
18.07.2018 [JASON-2] : SATELLITE IN SAFE HOLD MODE SINCE WEDNESDAY JULY 18th 09:00 UTC
Jason-2 spacecraft entered into safe mode Wednesday, July 18th at 09:00 UTC, immediately interrupting its measurements.[details]
05.06.2018 Temporary unavailibility of AVISO+ Sea views
Temporary unavailibility of AVISO+ Sea views June 5th between 7h and 12h UTC[details]
22.05.2018 Jason2 IGDR during last AMR anomaly have been disseminated on 2018/05/22
2018/04/17 Jason2 IGDR during AMR anomaly (cycle 528 passes 121 to 128) have been disseminated on 2018/05/22[details]
14.05.2018 Temporary interruption of the Aviso+ website on May 15th
For maintenance reasons, the AVISO+ website will be unavailable on Tuesday 15th May for some hours from 10:00 CET.[details]
06.04.2018 Jason-2 MOE/IGDR production may be delayed
Some excess fuel depletion maneuvers for Jason-2 are planned from 2018/04/06 to 2018/04/17[details]