Operational News
Operational news about Ssalto and Duacs processing system.
13.06.2013 update of processing chain planned on June 25
We are pleased to announce an update of the processing chain which calculates the model-based atmospheric corrections, associated with a vertical resolution increase of the ECMWF model. [details]
13.05.2013 The server avisoftp.cnes.fr is momentarily unavailable
The server avisoftp.cnes.fr is momentarily unavailable. [details]
12.04.2013 [Jason-2] Jason-2 back to operational mode
Jason-2 is back to operational mode since April 5th.[details]
08.04.2013 [Jason-2] Restart of core mission
Friday 5th April, the POSEIDON3 altimeter, the AMR radiometer and precise GPS have been switched on; allowing the mission to restart nominally. [details]
05.04.2013 [Jason-2] Restart expected by Friday April 5th
All the recovery operations are going smoothly and without any trouble. On 5th April, Jason-2 will be back in nominal mode and the core payload switch on will be performed.[details]
03.04.2013 [Jason-2] Recovery in progress
The recovery procedure has been optimized and the current schedule foresee to turn on the Jason-2 payload core science instruments (POSEIDON3, AMR, GPSP) on Friday, 5 April.[details]
02.04.2013 [Jason-2] new Safe Hold Mode
Few hours after the recovery, the Jason-2 spacecraft entered again in safe mode on 30 March 2013.[details]
29.03.2013 [Jason-2] Restart of core mission
On 2013/03/29, the POSEIDON3 altimeter has been switched on.[details]
28.03.2013 [Jason-2] Jason-2 status update - start of recovery
The Jason-2 spacecraft entered safe mode on 25 March 2013 at approximately 03:30:59z. The current schedule foresee to turn on the Jason-2 payload core science instruments (POSEIDON3, AMR, GPSP) on Saturday, 30 March.[details]