Operational News
Operational news about Ssalto and Duacs processing system.
08.07.2022 [CNES Data Center] System failure
Due to an unexpected system failure CNES Data Center is not operational[details]
29.04.2022 [JASON-3] IGDR distribution authorized from April 28th
As planned, a quick CALVAL check was performed on Jason-3 IGDRs before authorizing their distribution.[details]
22.04.2022 [JASON-3] Restart on interleaved orbit on Monday April 25th / 11:00 UTC
Jason-3 has now nearly completed its maneuvers to the interleaved position on the reference orbit[details]
25.03.2022 AVISO Unscheduled outage : recovery completed
Following unscheduled outage, AVISO data access is available again[details]
25.03.2022 AVISO Unscheduled outage
Following a system failure, access to AVISO data is strongly disturbed[details]
11.02.2022 Aviso Cnes Data Center: Commands are delayed.
Due to data storage access issue, all order submitted from the AVISO Cnes Data Center catalogue are currently delayed.
We are sorry for the inconvenience.
20.12.2021 [CRYOSAT2] Satellite Safe Hold Mode recovery completed December 17th 10h54 UTC
CRYOSAT2 Satellite Safe Hold Mode recovery completed December 17th 10h54 UTC
17.12.2021 [CRYOSAT2] Satellite in Safe Hold Mode since December 16th 2021 08:28 UTC
Cryosat2 satellite is in Safe Hold Mode since December 16th 2021 08:28 UTC.
We have no yet information about on the schedule of spacecraft operations to return to nominal mode.
27.09.2021 [CFOSAT] Version 3.3 of SCAT processing chain
New SCAT version 3.3 deployed since September 20th 2021[details]